For railway projects

Living Safety Cases for Rail

A risk matrix built to the European railway safety standard’s own worked example, connected bow-tie diagrams for every fault, and each safety measure linked to the integrity level it must meet.

Request the working demo Book a walkthrough

Built to EN 50126, From Risk Category to Integrity Level

The rail template's risk matrix for staff, as the template sets it out: likelihood down the side, severity across the top, and a risk category in each cell.
The rail template: staff.
  • See the standard’s own matrix Start from the risk categories in EN 50126 (part 1, Annex C, Table C.9).
  • See the integrity level follow the risk Carry each fault’s safety integrity level (SIL, 1 to 4) with its risk category, so a requirement never goes missing.
  • See the schedules fill themselves Feed requirements into the Protection and Engineering Schedules, with each proof-test interval beside its integrity level.
  • See the hazard record CSM-RA expects Every hazard with its requirement, its measures and their evidence, kept current as the case is revised.
  • See a hazard record that keeps up Trace every safety requirement back to the hazard it controls, with the evidence that closes it.

Does your hazard record keep up with your railway?

Ready to build your first Living Safety Case?

Request the working demo Book a walkthrough